ERCO Sharjah Production Office
In one of our most challenging projects, we had the task of replacing and rewiring an entire control table for a manufacturing plant without affecting the control computers.
The project was completed without losing an hour in production time, which was a major challenge in itself. As any other case, it started with a good design and a few really clever solutions. The table started off with a closed perforated cabinet designed specially for the CPU units to enhance passive air flow and cooling.
All connections were then passed through the spine of the table to the monitors and other peripherals through a custom designed latch mechanism. The end product was highly appreciated and continues to serve the client well today.